Home/MCCs & Switchboards

Industrial Switchboard Solutions

Heavy-duty Motor Control Centres and Switchboards engineered for mining, utilities, and critical infrastructure across Australia's harshest environments.

Mining CertifiedAS/NZS 61439 Certified
Mining
Utilities
Water
Energy
Agriculture
Our Products

Switchboard Solutions

Motor Control Centres

Purpose-built MCCs for mine sites, processing plants, and heavy industry. Designed for extreme temperatures, dust, and vibration.

  • DOL, Soft Starter & VSD Options
  • Form 1 to Form 4b Segregation
  • Ratings up to 3000A+
  • Intelligent Motor Protection

Main Switchboards

High-capacity main switchboards for substations, processing facilities, and critical infrastructure applications.

  • 415V - 1000V AC Systems
  • Arc Flash Protection
  • Power Metering & Monitoring
  • Tinned Copper Busbars

Distribution Boards

Reliable power distribution for workshops, site offices, and auxiliary systems with full circuit protection.

  • Single & Three Phase Options
  • RCBO Protection
  • Surge Protection Devices
  • Custom Configuration

Control & PLC Panels

Integrated automation panels with PLC, HMI, and communication systems for process control applications.

  • Allen-Bradly, Siemens,Schneider and GE PLC's
  • Ethernet/IP, Profinet, Modbus
  • HMI Touchscreens
  • Remote I/O Integration
Built Tough

Technical Specifications

Voltage Range

415V - 1000V

AC systems available

Current Rating

Up to 3000A+

Custom builds available

IP Rating

IP54 - IP66

Outdoor & dusty environments

Compliance

AS/NZS 61439

Fully certified

Construction Options

Mild Steel

Cost-effective option for indoor applications.

Stainless Steel 316

Ideal for corrosive and coastal environments.

Aluminium

Lightweight choice for portable and modular systems.

The ESE Difference

Why Mining Leaders Choose ESE

Safety First

Arc-flash reinforced designs with comprehensive protection systems safeguarding your personnel and equipment.

Fast Turnaround

In-house engineering and manufacturing, combined with dedicated project teams, allow us to beat standard lead times.

Full FAT Testing

Comprehensive Factory Acceptance Testing ensures your equipment is fully operational before leaving our facility.

2000+
Boards Built
20+
Years Experience
50+
Mine Sites Serviced

Planning a Site Upgrade?

Get a consultation with our principal engineers about your specific MCC requirements.